Wednesday, 16 April 2008

Update

No photo's this time, but here is what's been happening.

All the floors in both front rooms have been leveled and replaced. Things are moving back towards making the place like a house rather than a building site.

Last night was the saw the first room being plastered. This is real progress, only 2 more rooms and a hallway to plaster. The electrican is also still plugging away (rather slowly).

And now for my first list:

The What's Left To Do List:
-Plaster 2 rooms
-Plumb Kitchen
-Put flooring down in kitchen/backroom
-Lift hallway floor
-Level joist in hallway
-Lay new hallway floor
-Install wood stove
-Install Kitchen
-Relay upstairs carpets
******MOVE IN******

Or something like that.

Oh and I cut the grass for the first time last week too.