No photo's this time, but here is what's been happening.
All the floors in both front rooms have been leveled and replaced. Things are moving back towards making the place like a house rather than a building site.
Last night was the saw the first room being plastered. This is real progress, only 2 more rooms and a hallway to plaster. The electrican is also still plugging away (rather slowly).
And now for my first list:
The What's Left To Do List:
-Plaster 2 rooms
-Plumb Kitchen
-Put flooring down in kitchen/backroom
-Lift hallway floor
-Level joist in hallway
-Lay new hallway floor
-Install wood stove
-Install Kitchen
-Relay upstairs carpets
******MOVE IN******
Or something like that.
Oh and I cut the grass for the first time last week too.